Saturday 3 September 2011

Group work


In the 3rd meeting, the place is in one of our group member’s house, we are discussing about the shooting problem with green background wall, and the actor’s line.  We are facing the place problem and we come out the idea which is using the green paper to stick at the wall be our background and use the adobe after effects to edit it before process in adobe flash. Besides that, we also facing the software installation problem, because adobe after effects is required window 7 64 bits but all of us is using 32 bits, so we need to reformat 1 of the group member computer and finally we are success to install and complete the work by using adobe after effect. 

 The actor's line that create by each members.


The green paper that we stick on the wall, propose is to shooting a video that we plan to add in our assignment 3.

 Group members ^^

No comments:

Post a Comment